Schedule a Walkthrough

04 · Post-construction cleanup

Move-in ready means nothing left behind.

The risk is the dust you can’t see yet, and residue on brand-new finishes. Drywall dust in returns and light fixtures, overspray on glass, adhesive on floors that were just installed. Done wrong, the first week of occupancy undoes the build-out.

Built for general contractors, new build-outs, renovations, tenant improvements and pre-move-in cleans.

Spec cardWritten · Assigned · Verified
Phases
Rough clean, final clean and touch-up, scheduled around the trades.
Dust
HEPA vacuum and damp-wipe, top down — vents, sills, ledges and fixtures first, floors last.
Residue
Labels, adhesive and overspray removed with methods matched to each new finish.
Handoff
A punch-list walkthrough with you or the GC before occupancy.
Verification
A timestamped photo set of every area at handoff.

How the work is done

Phased with your schedule — rough clean after the trades, final clean before the walkthrough, touch-up after the punch list.
Worked top down, so nothing resettles on surfaces that are already done.
HEPA vacuums for fine drywall dust, and damp-wiping instead of dry dusting.
A written scope listing every area and phase, with the exclusions named.

Listen for in other bids

“One visit at the end of the job.” A single pass leaves dust that resettles by week one.
Dry dusting, or a shop vac on drywall dust.
A razor blade or acid on new glass, stone or coatings “to get it off.”
No walkthrough and no photos before handoff.

Schedule a walkthrough

We quote from the building, not the phone

1We walk the building with you and measure it. Twenty minutes is usually enough to spec it properly.
2You get the scope in writing, task by task, with a frequency on every line and the exclusions named.
3We answer the ten questions in writing. The number comes after that, not before it.

We take a limited number of accounts because every one gets an assigned crew and a written site-specific workup before the first night.

We would rather earn this on answers than on a number.