04 · Post-construction cleanup
Move-in ready means nothing left behind.
The risk is the dust you can’t see yet, and residue on brand-new finishes. Drywall dust in returns and light fixtures, overspray on glass, adhesive on floors that were just installed. Done wrong, the first week of occupancy undoes the build-out.
Built for general contractors, new build-outs, renovations, tenant improvements and pre-move-in cleans.
Spec cardWritten · Assigned · Verified
Phases
Rough clean, final clean and touch-up, scheduled around the trades.
Dust
HEPA vacuum and damp-wipe, top down — vents, sills, ledges and fixtures first, floors last.
Residue
Labels, adhesive and overspray removed with methods matched to each new finish.
Handoff
A punch-list walkthrough with you or the GC before occupancy.
Verification
A timestamped photo set of every area at handoff.
How the work is done
Phased with your schedule — rough clean after the trades, final clean before the walkthrough, touch-up after the punch list.
Worked top down, so nothing resettles on surfaces that are already done.
HEPA vacuums for fine drywall dust, and damp-wiping instead of dry dusting.
A written scope listing every area and phase, with the exclusions named.
Listen for in other bids
“One visit at the end of the job.” A single pass leaves dust that resettles by week one.
Dry dusting, or a shop vac on drywall dust.
A razor blade or acid on new glass, stone or coatings “to get it off.”
No walkthrough and no photos before handoff.